SPC flooring, skirting and wall-panel glossary

Use these terms to read a specification, compare a quotation or plan an installation. Apply numerical limits to the identified Kermit product and follow its current instructions.

Technical documents

Product construction

SPC

A rigid vinyl flooring construction. RFCI and MMFA use the abbreviation for solid polymer core. The name does not specify thickness, backing or every performance property.

Read the guide →
Rigid core

The supporting body beneath the decorative layers. Core construction and overall plank thickness are separate specification questions.

Read the guide →
Wear layer

The layer above the decor identified separately from overall thickness. Its stated thickness is not a scratch-proof guarantee.

Read the guide →
Decor and product code

The design reference used to identify the appearance being ordered. Keep the code with the sample; similar names or images do not establish an exact match.

Read the guide →
Overall thickness

The stated thickness of the complete product configuration. Confirm whether attached backing is included before comparing two offers.

Read the guide →
IXPE backing

A foam backing specified on some flooring configurations. Its presence, thickness and compatibility must be checked for the selected product.

Read the guide →
Click system

The shaped joint connecting adjacent planks. The selected lock determines the fitting sequence and relevant installation instructions.

Read the guide →

Installation and quantities

Floating floor

A floor laid as an interconnected surface that must remain free to move. Fixed objects and trims must not pin it down.

Read the guide →
Subfloor

The supporting base on which the flooring system is installed. Identify its material, condition and moisture before selecting preparation products.

Read the guide →
Flatness

Local surface evenness, distinct from the overall slope of a room. Kermit’s manual sets a maximum unevenness of 2 mm over 1 m.

Read the guide →
Movement gap

Clearance that allows a floating floor to move. Kermit’s manual requires at least 10 mm around walls and fixed objects; additional joints depend on the layout.

Read the guide →
Transition profile

A profile used at a planned junction between floor areas or finishes. Choose its detail and fixing without restricting the required floor movement.

Read the guide →
Moisture barrier

A layer specified to manage moisture from the base. It has a different purpose from cushioning underlay or room waterproofing.

Read the guide →
Underlay

A layer beneath the floor selected for the complete system. Confirm compatibility, especially where the plank already has attached backing.

Read the guide →
Carton coverage

The confirmed square metres supplied in one carton of the exact product. Use this value to round an area calculation up to complete cartons.

Read the guide →
Cut allowance and spare stock

A cut allowance covers the expected layout losses. Reserve full planks or unopened cartons separately if they are needed for future work.

Read the guide →

Performance and documents

Use class

A declared classification for the product’s intended intensity of use. Read it with the selected technical sheet and installation limits, not as approval for every room.

Read the guide →
Acoustic assembly

The combination of floor, backing or underlay and supporting construction associated with a sound test. A result cannot simply be transferred to different layers.

Read the guide →
Floor-surface temperature

Temperature at the finished walking surface. Kermit’s limit is 27°C in an approved underfloor-heating application; this is not the heating-water setting.

Read the guide →
Thermal resistance

A measure used when assessing heat flow through the specified layers. Heating compatibility requires the complete floor build-up and system approval.

Read the guide →
Water resistance

A product characteristic that must be read with its exposure limits. It does not make a room waterproof or remove the need to check substrate moisture.

Read the guide →
Technical data sheet (TDS)

The manufacturer’s description of a defined product and its technical properties. Check its revision and configuration; it is not automatically independent certification.

Read the guide →
Emissions

Substances released under specified test conditions. Read the method, units and sample scope; ingredient content and emissions are different questions.

Read the guide →
Certificate scope

The products, organization, activities or sites covered by a particular certificate. Match the actual claim and order to that scope and verify current status.

Read the guide →

Ordering and supply

Batch reference

An identifier linking delivered goods to their production record. Retain labels with the decor and order information for enquiries or repeat supply.

Read the guide →
Minimum order quantity (MOQ)

The minimum commercial order. Kermit’s wholesale SPC flooring MOQ is one container; the actual loading quantity depends on the agreed specification.

Read the guide →
Lead time

The quoted time for an agreed order stage. Kermit’s standard lead time is four weeks; confirm the start basis and separate transport schedule in the quotation.

Read the guide →
OEM and private label

Supply for a buyer’s product or brand brief. Kermit offers this capability; product details, artwork and any certification/logo scope are agreed for the order.

Read the guide →
Landed cost

A defined total cost to receive goods at the chosen destination. Identify included charges, quantity, currency and tax treatment before comparing unit figures.

Read the guide →

Skirting and wall panels

Skirting height and thickness

Height is the visible rise up the wall; thickness describes the profile’s projection. Neither is its supplied length, which matters for cutting and quantity.

Read the guide →
Flexible edge

A flexible contact edge on a specified skirting profile. It is a profile feature, not a replacement for wall preparation or a complete waterproofing system.

Read the guide →
Wall substrate

The surface supporting a wall-panel installation. Its condition, moisture and compatibility with the selected fixing system need separate assessment from a floor.

Read the guide →
Finish schedule

A room-by-room record of flooring, skirting and wall products, with their quantities, references and installation details kept distinct.

Read the guide →